Ak Gıda Aydın Milk Factory

Ak Gıda's Aydın Dairy Plant is a modern Turkish investment of Lactalis, a leading global dairy producer. Its high-capacity, advanced production lines are supported by turnkey electrical infrastructure designed for industrial requirements for power continuity and operational safety.

End Client
AK GIDA A.Ş.
Direct Client
AK GIDA A.Ş.
Location
Aydın
Status
Completed
Project Period
2014-2015
Project Area
25 000 m²
Installed Capacity
2 × 2 000 kVA
Contract Role
Turnkey Electrical Works Contractor

Arenes’ Role

We completed, tested and commissioned turnkey medium-voltage, low-voltage, specialist electrical and low-current systems for Ak Gıda's Aydın Dairy Plant, with 2 × 2000 kVA installed capacity.

Project Technical Scope

Medium- and Low-Voltage Systems

All 36 kV medium-voltage and 0.4 kV low-voltage systems, transformer substations, LV main switchboards, distribution lines and power installations were installed and commissioned, providing reliable energy for uninterrupted production.

Specialist Electrical Systems

Specialist electrical systems were installed to supply milk processing lines, production equipment, auxiliary operations and process areas, supporting safe, efficient industrial production.

Low-Current Systems

Data and communications, fire detection and alarm, CCTV, sound, public address and other low-current systems were installed and integrated throughout the facility, then commissioned to meet operational safety and continuity requirements.

Testing and Commissioning

All electrical and low-current systems were functionally tested, and protection, control and automation scenarios were verified. Systems were commissioned to the required performance criteria and handed over turnkey to facility management.