Ak Gıda Kahramanmaraş Süt Fabrikası
Ak Gıda's Kahramanmaraş Dairy Plant is a modern integrated Turkish production facility of Lactalis, a leading global dairy group. Its advanced production lines are supported by turnkey electrical infrastructure meeting industrial requirements for power continuity, safety and efficiency.
- End Client
- AK GIDA A.Ş.
- Direct Client
- AK GIDA A.Ş.
- Location
- Kahramanmaraş
- Status
- Completed
- Project Period
- 2013 -2014
- Project Area
- 15 000 m²
- Installed Capacity
- 1 600 kVA + 2 000 kVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
All 36 kV medium-voltage and 0.4 kV low-voltage systems, transformer substations, LV main switchboards, distribution lines and power installations were installed and commissioned, providing reliable energy for uninterrupted production.
Specialist Electrical Systems
Specialist electrical systems were installed to supply milk processing lines, production equipment, auxiliary operations and process areas, supporting safe, efficient industrial production.
Low-Current Systems
Data and communications, fire detection and alarm, CCTV, sound, public address and other low-current systems were installed and integrated throughout the facility, then commissioned to meet operational safety and continuity requirements.
Testing and Commissioning
All electrical and low-current systems were functionally tested, and protection, control and automation scenarios were verified. Systems were commissioned to the required performance criteria and handed over turnkey to facility management.