Antalya COP31 Project
Antalya COP31 is a prestigious international-scale event project for the United Nations Climate Change Conference, combining sustainability, energy efficiency and advanced infrastructure requirements. ARENES GROUP plays an active role in developing the technical infrastructure through electromechanical design coordination, implementation management and commissioning.
- End Client
- Antalya COP31 Project
- Direct Client
- ÖZYAZICI İNŞAAT
- Location
- Antalya / Türkiye
- Status
- In Progress
- Project Period
- 2026
- Installed Capacity
- 6 MVA
- Contract Role
- Turnkey HVAC Systems Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
Distribution infrastructure, medium- and low-voltage systems, main switchboards, supply lines and power installations are being installed for 6 MVA capacity, meeting international standards for reliable, uninterrupted power.
Specialist Electrical Systems
Specialist electrical systems are being installed for conference areas, exhibition spaces, event centres, technical rooms and support areas. Interior, exterior and architectural lighting and infrastructure supporting event operations are being integrated.
Low-Current Systems
Installation and integration of fire detection and alarm, data and communications, CCTV, access control, sound, emergency public address and other low-current systems are ongoing.
Mechanical Systems
HVAC, ventilation, heating and cooling, plumbing and mechanical firefighting installations are being implemented. All mechanical systems are designed and installed for high user comfort and energy efficiency.
Automation Systems
Building management, energy monitoring and automation solutions are being implemented for centralised monitoring and control of electrical and mechanical systems. Integrated operation is designed to support sustainable operational performance.
Testing and Commissioning
Functional testing, integration checks and performance verification of electrical, mechanical, automation and low-current systems are progressing with the project. Systems will be fully commissioned to international standards and handed over complete.