Ataturk Supreme Council For Culture, Language And History ( Tdk )

The Atatürk Supreme Council for Culture, Language and History complex in Ankara has 106,000 m² of enclosed space. Its distinctive star-shaped architecture comprises five wings, each representing a different institution, making it one of Türkiye's significant public buildings.

End Client
Atatürk Supreme Council for Culture, Language and History (TDK)
Direct Client
Özyazıcı İnşaat A.Ş.
Location
Ankara / Türkiye
Status
Completed
Project Period
2023 - 2024
Project Area
106 000 m²
Installed Capacity
6 MVA
Contract Role
Turnkey Electrical Works Contractor

Arenes’ Role

Earthing and lightning protection; cable containment, trays and conduits; lighting, UPS and socket installations; mechanical equipment and riser power cabling; main distribution and synchronisation panels, power-factor correction panels, MCC panels, lighting and socket panels; busbar systems from 250 A to 3200 A; UPS systems up to 400 kVA.

Project Technical Scope

Medium- and Low-Voltage Systems

Engineering, installation, testing and commissioning were completed for 36 kV medium-voltage and 0.4 kV low-voltage systems with 6 MVA installed capacity, alongside fire detection, CCTV, card access, BMS and SCADA infrastructure. The integrated systems meet the facility's needs for reliable, sustainable and uninterrupted operation.

Specialist Electrical Systems

Installation and commissioning of a dedicated 460 kVA, 380/220 V three-phase isolation transformer; critical and uninterrupted power systems; process equipment power supplies; and the facility's specialist video and public address systems.

Low-Current Systems

Fire detection, emergency announcements, security, IP telephony, CCTV and TV, internet/intranet, and BMS/SCADA integration across production and administrative areas.

Testing and Commissioning

All automation, electrical and technical systems underwent comprehensive testing and commissioning against integrated operating scenarios. Inter-system communications, control and performance were verified, bringing the facility into safe, fully functional operation.