Caglayan Central Parking

The Çağlayan Central Car Park was developed to meet growing parking demand in busy İstanbul and provide safe access for users. Electrical and low-current infrastructure for its multi-storey parking, social spaces and support units was delivered turnkey, prioritising safety and operational continuity.

End Client
MERKEZİ OTOPARK İŞLETMELERİ TİC. A.Ş.
Direct Client
MERKEZİ OTOPARK İŞLETMELERİ TİC. A.Ş.
Location
İstanbul
Status
Completed
Project Period
2013-2015
Project Area
40 000 m²
Installed Capacity
2 MVA
Contract Role
Turnkey Electrical Works Contractor

Arenes’ Role

We completed and commissioned turnkey 36 kV medium-voltage, 0.4 kV low-voltage, specialist electrical and low-current systems for the Çağlayan Central Car Park, with 2 MVA installed capacity.

Project Technical Scope

Medium- and Low-Voltage Systems

36 kV medium-voltage and 0.4 kV low-voltage distribution systems were installed. The substation, main switchboards, distribution lines and power installations were commissioned to support uninterrupted operation throughout the car park.

Specialist Electrical Systems

Electrical infrastructure was installed for parking levels, entrances and exits, administrative areas and technical rooms. Ventilation, lighting, guidance equipment and specialist car park electrical systems were integrated.

Low-Current Systems

Fire detection and alarm, CCTV, data and communications, sound, emergency public address and other low-current systems were installed throughout the facility and integrated for safe, efficient operation.

Testing and Commissioning

Medium-voltage, low-voltage, low-current and automation systems underwent functional testing, performance verification and full integration. They were commissioned to operational requirements and handed over turnkey.