Coworking Office "Level 8"
Level 8 Coworking Office in Almaty's prestigious Esentai Tower, Kazakhstan, is an international-standard workspace designed for modern working habits and flexible office needs. Electrical and low-current infrastructure was delivered turnkey to meet high standards of user comfort, energy efficiency and technological integration.
- End Client
- Level 8 Coworking Office
- Direct Client
- CAPITAL TOWER DEVELOPMENT
- Location
- Almaty
- Status
- Completed
- Project Period
- 2018
- Project Area
- 1 600 m²
- Installed Capacity
- 0.2 MVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
Low-voltage distribution systems, main and subsidiary panels, supply lines, sockets and lighting were installed for the office. All electrical infrastructure was commissioned for reliable, uninterrupted distribution.
Specialist Electrical Systems
Electrical infrastructure was created for open-plan offices, meeting rooms, shared workspaces, private offices and social areas. High-performance lighting, distribution and comfort-focused electrical systems were integrated to meet modern workplace requirements.
Low-Current Systems
Data and communications, access control, CCTV, fire detection and alarm, and other low-current systems were installed throughout the office and integrated to ensure user safety and uninterrupted communications.
Testing and Commissioning
Medium-voltage, low-voltage, low-current and automation systems underwent functional testing, performance verification and full integration. They were commissioned to operational requirements and handed over turnkey.