Doğadan Tea Factory
The Doğadan Tea Factory is a modern extension to the existing plant in Akyurt, Ankara. Serving tea processing, drying and packaging, its electrical infrastructure was delivered turnkey for production continuity and energy efficiency, with all systems commissioned to high engineering standards.
- End Client
- Doğadan Tea Factory
- Direct Client
- DİEM MÜHENDİSLİK MİMARLIK A.Ş
- Location
- Ankara
- Status
- Completed
- Project Period
- 2019
- Project Area
- 10 000 m²
- Installed Capacity
- 1.6 MVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
36 kV medium-voltage and 0.4 kV low-voltage systems were installed. The transformer substation, distribution panels, power installations and distribution infrastructure were commissioned to provide reliable, continuous energy for factory production.
Specialist Electrical Systems
Electrical infrastructure was installed for tea processing, drying, packaging and auxiliary production areas. Process equipment supplies and specialist production-line systems were integrated to improve production efficiency and support operational continuity.
Low-Current Systems
Data and communications, fire detection and alarm, CCTV, sound, public address and other low-current systems were installed and integrated throughout the facility, then commissioned to meet operational safety and continuity objectives.
Testing and Commissioning
All medium-voltage, low-voltage and low-current systems underwent functional testing, performance verification and integration. They were commissioned to operational requirements and handed over turnkey.