Edirne 54th Mechanized Infantry Brigade Command 12 Border Posts
Twelve border posts were built along the Edirne–Kırklareli border sector under Edirne's 54th Mechanised Infantry Brigade Command to strengthen border security and operational effectiveness. These strategic facilities were designed for continuous duty with modern security technology and critical infrastructure.
- End Client
- Twelve Border Posts of Edirne's 54th Mechanised Infantry Brigade Command
- Direct Client
- ÖZYAZICI İNŞAAT
- Location
- Edirne / Kırklareli
- Status
- Completed
- Project Period
- 2023 - 2024
- Project Area
- 13 994 m²
- Installed Capacity
- 3 MVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
36 kV medium-voltage and 0.4 kV low-voltage distribution, substations, distribution panels, power installations and power infrastructure were completed and commissioned to meet all operational needs of the border posts reliably and without interruption.
Specialist Electrical Systems
Specialist electrical infrastructure was installed for security systems, guard positions, operations centres, administrative buildings and technical areas, with highly reliable power solutions ensuring continuity of critical duties.
Low-Current Systems
Fire detection and alarm, data and communications, CCTV, perimeter security, access control, sound and emergency public address systems were installed and fully integrated.
Testing and Commissioning
Medium-voltage, low-voltage, security and low-current systems underwent functional testing, protection and control verification, and full integration. They were commissioned to operational requirements and handed over turnkey.