Gok Energy 11 MW Hydroelectric Power Plant Project

GÖK Enerji's 11 MW Hydroelectric Power Plant in Mersin is a significant renewable energy investment. ARENES Elektrik delivered civil works, electromechanical systems and energy infrastructure turnkey, commissioning the plant for reliable, sustainable generation.

End Client
GÖK ENERJİ A.Ş.
Direct Client
GÖK ENERJİ A.Ş.
Location
Mersin
Status
Completed
Project Period
2015
Installed Capacity
11 MVA
Contract Role
Turnkey Civil, Electromechanical and Energy Infrastructure Contractor

Arenes’ Role

ARENES delivered civil works, electromechanical systems, MV/LV infrastructure, SCADA, automation and power line installations for GÖK Enerji's 11 MW Hydroelectric Power Plant turnkey, successfully commissioning it for energy generation.

Project Technical Scope

Medium- and Low-Voltage Systems

Medium- and low-voltage systems, substations, distribution panels, power installations and transmission infrastructure were installed for plant generation and distribution, enabling safe, uninterrupted delivery to the grid.

Specialist Electrical Systems

Specialist electrical systems were installed for turbine-generator units, auxiliary operations, plant equipment and process units. Integrated infrastructure improves generation efficiency and operational continuity.

Low-Current Systems

Data communications, security, fire detection, operational networks and low-current monitoring systems were installed and integrated with the plant's central management infrastructure.

Mechanical Systems

Intake structures, the penstock, turbine systems, generator equipment and auxiliary electromechanical systems were installed. All mechanical infrastructure supporting generation was completed to the technical specifications.

Automation Systems

Protection, control and SCADA systems enable central monitoring and management of all plant processes. Generation data, equipment performance and operations are controlled through the automation infrastructure.

Testing and Commissioning

Electrical, mechanical and automation systems underwent functional testing, with performance checks on high-voltage connections, the power line and plant equipment. The facility was commissioned to generation criteria and handed over for operation.