Istanbul Maslak Campus New Service Buildings

The New Service Buildings at İstanbul's Maslak Campus combine modern architecture and advanced engineering for high-security public service facilities. Across 105,000 m² of construction area, power, security and building technologies were implemented for high reliability and operational continuity.

End Client
İstanbul Maslak Campus New Service Buildings
Direct Client
ÖZYAZICI İNŞAAT
Location
İstanbul
Status
Completed
Project Period
2017 - 2018
Project Area
105 000 m²
Installed Capacity
19.2 MVA
Contract Role
Turnkey Electrical Works Contractor

Arenes’ Role

We completed and commissioned turnkey 36 kV medium-voltage, 0.4 kV low-voltage and all low-current systems for the New Service Buildings at İstanbul's Maslak Campus, with 19.2 MVA installed capacity and advanced technical infrastructure.

Project Technical Scope

Medium- and Low-Voltage Systems

36 kV medium-voltage and 0.4 kV low-voltage distribution systems, substations, main switchboards, supply lines and power installations were installed and commissioned for reliable, uninterrupted energy across the campus.

Specialist Electrical Systems

Specialist electrical systems were installed for administrative buildings, operational areas, shared spaces and technical rooms. Interior and exterior lighting, critical-load supplies and project-specific power infrastructure were implemented to high engineering standards.

Low-Current Systems

Fire detection and alarm, data and communications, CCTV, card access, sound, emergency public address and other low-current systems were installed campus-wide and integrated with central management infrastructure.

Testing and Commissioning

Medium-voltage, low-voltage and low-current systems underwent functional testing, protection and control verification, and integration. All infrastructure was commissioned to the required performance criteria and handed over turnkey.