Kecioren Dunya Goz Hospital
The electrical infrastructure of the Dünyagöz healthcare complex in Keçiören, Ankara, was delivered turnkey to meet modern healthcare requirements for safety, power continuity and operational efficiency.
- End Client
- Dünyagöz Hospitals A.Ş.
- Direct Client
- Dünyagöz Hospitals A.Ş.
- Location
- Keçiören
- Status
- Completed
- Project Period
- 2015
- Project Area
- 3 125 m²
- Installed Capacity
- 1 MVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
The hospital's 1 MVA power infrastructure includes medium-voltage supply, low-voltage main switchboards, distribution lines and power installations. The distribution infrastructure was commissioned for reliable, uninterrupted supply.
Specialist Electrical Systems
Specialist electrical systems were installed for operating theatres, examination rooms, diagnostic and treatment units, and technical areas. Infrastructure ensuring safe, continuous operation of critical medical devices was implemented to healthcare standards.
Low-Current Systems
Installation and integration were completed for fire detection and alarm, CCTV, data and communications, sound and public address, and other low-current systems.
Testing and Commissioning
All electrical and low-current systems were functionally tested and their protection, control and safety scenarios verified. Following commissioning to the required performance criteria, they were handed over turnkey to hospital management.