Kumas Magnesite 51.5 MVA Solar Power Plant Project

KÜMAŞ Manyezit Sanayi A.Ş.'s 51.5 MVA Solar Power Plant in Sivas was developed to meet the company's energy needs from renewable sources and support sustainable production. Led by OYAK Renewable Energy, the project's site works are being delivered turnkey by ARENES Elektrik.

End Client
Kümaş Manyezit Sanayi A.Ş. – 51.5 MVA Solar Power Plant
Direct Client
OYAK YENİLENEBİLİR ENERJİ A.Ş.
Location
Sivas
Status
In Progress
Project Period
2025
Project Area
615 000 m²
Installed Capacity
51.5 MVA
Contract Role
Turnkey Solar Power Plant Site Works Contractor

Arenes’ Role

ARENES Elektrik is delivering turnkey medium- and low-voltage systems, specialist electrical and low-current infrastructure, mechanical installation, automation and commissioning for KÜMAŞ's 51.5 MVA Solar Power Plant. Work is progressing successfully.

Project Technical Scope

Medium- and Low-Voltage Systems

Medium- and low-voltage distribution systems are being installed for safe, efficient transfer of solar generation. Work includes collection centres, site distribution, cabling and connection equipment.

Specialist Electrical Systems

Photovoltaic panels, inverter infrastructure, DC and AC collection systems and specialist generation infrastructure are being installed and integrated to maximise the plant's energy production efficiency.

Low-Current Systems

Data communications, security, site communications networks and remote monitoring systems are being installed for plant operation and safety, with integration into central control infrastructure.

Mechanical Systems

Steel support structures for solar panels, site equipment and auxiliary mechanical systems are being installed to suit site conditions and integrated with the generating systems.

Automation Systems

SCADA, energy monitoring and remote control systems are being installed to monitor and manage generation performance. Central automation tracks all production data for efficient plant operation.

Testing and Commissioning

Electrical, mechanical and automation testing and commissioning are progressing to the project schedule. Completed installations undergo functional tests and are prepared for operation.