Meteksan Defense Industry

Meteksan Defence's DUNKER Simulator is a strategic, specialised defence facility for training and rescue scenarios involving helicopter accidents at sea. Designed with advanced engineering, all electrical and low-current infrastructure was delivered turnkey for high reliability and operational continuity.

End Client
Meteksan Defence
Direct Client
DOST İNŞAAT PROJE YÖNETİMİ A.Ş.
Location
İzmit
Status
Completed
Project Period
2020 - 2021
Project Area
5 000 m²
Installed Capacity
1 MVA
Contract Role
Turnkey Electrical Works Contractor

Arenes’ Role

We completed and commissioned turnkey 36 kV medium-voltage, 0.4 kV low-voltage and all low-current systems for Meteksan Defence's DUNKER Simulator, providing the highly reliable electrical infrastructure this strategic facility requires.

Project Technical Scope

Medium- and Low-Voltage Systems

36 kV medium-voltage and 0.4 kV low-voltage distribution systems were installed for 1 MVA capacity. The substation, main switchboards, cabling and power installations were completed and commissioned for reliable, uninterrupted simulator power.

Specialist Electrical Systems

Specialist electrical systems were installed for the DUNKER simulator, training pools, technical rooms and operational areas. Power infrastructure for safe, efficient operation of advanced training equipment was integrated to project requirements.

Low-Current Systems

Fire detection and alarm, data and communications, CCTV, sound, public address and other low-current systems were installed throughout the facility, integrated and commissioned to support training and operational activities.

Testing and Commissioning

Medium-voltage, low-voltage and low-current systems underwent functional testing, protection and control verification, and integration. All infrastructure was commissioned to the required performance criteria and handed over turnkey.