Pepsico / Frito Lay Factory - Additional Facility
The PepsiCo Frito Lay Manisa plant extension is a modern industrial investment to increase production capacity and efficiency. Electrical and automation infrastructure for the 5,500 m² enclosed facility was delivered turnkey, prioritising production continuity, energy efficiency and operational reliability.
- End Client
- PepsiCo / Frito Lay Factory Extension
- Direct Client
- DİEM MÜHENDİSLİK MİMARLIK A.Ş
- Location
- Manisa
- Status
- Completed
- Project Period
- 2020
- Project Area
- 5 500 m²
- Installed Capacity
- 2.5 MVA
- Contract Role
- Turnkey Electrical Works Contractor
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
The facility's 2.5 MVA power infrastructure includes 0.4 kV low-voltage distribution, main and subsidiary panels, distribution lines and power installations. This reliable infrastructure was commissioned to maintain uninterrupted production.
Specialist Electrical Systems
Specialist electrical systems were installed for production lines, process equipment and auxiliary units. Power supply and control infrastructure was implemented to the design to support efficient industrial production.
Low-Current Systems
Data and communications, fire detection and alarm, CCTV, sound, public address and other low-current systems were installed and integrated throughout the facility, then commissioned to meet operational safety and continuity requirements.
Testing and Commissioning
Electrical, low-current and industrial automation systems underwent functional testing, integration verification and performance checks. They were commissioned to operational requirements and handed over turnkey.