Presidential Palace Of The State Of The Kyrgyz Republic

Arenes Elektrik delivered turnkey mechanical, electrical and IT infrastructure for Kyrgyzstan's eagle-shaped Presidential Palace complex, comprising a 33,000 m² main building and 2,000 m² of ancillary buildings.

End Client
İnşaat Stroy LLP
Direct Client
Kyrgyz Republic
Location
Bishkek / Kyrgyzstan
Status
Completed
Project Period
2023 - 2024
Project Area
35 000 m²
Installed Capacity
10 MVA
Contract Role
Turnkey

Arenes’ Role

At Kyrgyzstan's Presidential Building, designed as an eagle with outstretched wings, Arenes Elektrik delivered all mechanical and electrical systems for the 33,000 m² main building and 2,000 m² of ancillary buildings on a 70,000 m² site. The turnkey scope included broadcast infrastructure, integrated security, BMS, SCADA and audio-visual systems for 15 conference halls.

Project Technical Scope

Medium- and Low-Voltage Systems

Engineering, installation, testing and commissioning were completed for 36 kV medium-voltage and 0.4 kV low-voltage systems with 6 MVA installed capacity, alongside fire detection, CCTV, card access, BMS and SCADA infrastructure. The integrated systems meet the facility's needs for reliable, sustainable and uninterrupted operation.

Specialist Electrical Systems

Installation and commissioning of a dedicated 460 kVA, 380/220 V three-phase isolation transformer; critical and uninterrupted power systems; process equipment power supplies; and the facility's specialist video and public address systems.

Low-Current Systems

Fire detection, emergency announcements, security, IP telephony, CCTV and TV, internet/intranet, and BMS/SCADA integration across production and administrative areas.

Testing and Commissioning

All automation, electrical and technical systems underwent comprehensive testing and commissioning against integrated operating scenarios. Inter-system communications, control and performance were verified, bringing the facility into safe, fully functional operation.