Presidential Palace Of The State Of The Kyrgyz Republic
Arenes Elektrik delivered turnkey mechanical, electrical and IT infrastructure for Kyrgyzstan's eagle-shaped Presidential Palace complex, comprising a 33,000 m² main building and 2,000 m² of ancillary buildings.
- End Client
- İnşaat Stroy LLP
- Direct Client
- Kyrgyz Republic
- Location
- Bishkek / Kyrgyzstan
- Status
- Completed
- Project Period
- 2023 - 2024
- Project Area
- 35 000 m²
- Installed Capacity
- 10 MVA
- Contract Role
- Turnkey
Arenes’ Role
Project Technical Scope
Medium- and Low-Voltage Systems
Engineering, installation, testing and commissioning were completed for 36 kV medium-voltage and 0.4 kV low-voltage systems with 6 MVA installed capacity, alongside fire detection, CCTV, card access, BMS and SCADA infrastructure. The integrated systems meet the facility's needs for reliable, sustainable and uninterrupted operation.
Specialist Electrical Systems
Installation and commissioning of a dedicated 460 kVA, 380/220 V three-phase isolation transformer; critical and uninterrupted power systems; process equipment power supplies; and the facility's specialist video and public address systems.
Low-Current Systems
Fire detection, emergency announcements, security, IP telephony, CCTV and TV, internet/intranet, and BMS/SCADA integration across production and administrative areas.
Testing and Commissioning
All automation, electrical and technical systems underwent comprehensive testing and commissioning against integrated operating scenarios. Inter-system communications, control and performance were verified, bringing the facility into safe, fully functional operation.